From 11 December 2027, the EU Cyber Resilience Act (CRA) requires a support period of at least five years for connected products placed on the market: for that time the manufacturer handles vulnerabilities and provides security updates. On embedded Linux, no single release carries that period today. Yocto's Scarthgap LTS ends in April 2028 and its Wrynose LTS in April 2030; the longest projection among the longterm kernels on kernel.org is December 2028. The support period of a product placed on the market on 11 December 2027 ends on 11 December 2032 at the earliest. This article puts the schedules side by side, does the math with its assumptions stated, and lists the ways to close the gap.

In short

  • CRA Article 13(8): the support period is at least five years; if the product is expected to be in use for less, it equals that time. Five years is the floor; the period has to reflect how long the product is expected to be in use.
  • Yocto LTS releases come out every two years and are supported for four. Scarthgap 5.0 runs until April 2028, Wrynose 6.0 until April 2030. Kirkstone 4.0 has been out of support since spring 2026.
  • Longterm kernels on kernel.org usually start with a two-year projection. The projected end of the 6.6 series is December 2027; for 6.12 and 6.18 it is December 2028.
  • A product placed on the market with Scarthgap on 11 December 2027 spends about four and a half months of its five years under upstream support. The remaining four years and seven and a half months or so need a plan.
  • On embedded Linux, five years of support is not solved by picking a release. At least one major release change happens while the devices are in the field, and it travels over the product's own update path.

What exactly does the CRA say about the support period?

Article 13 of Regulation (EU) 2024/2847 puts three separate time obligations on the manufacturer, and all three touch the engineering schedule directly.

The first is the support period itself. Under Article 13(8) it is at least five years; if the product is expected to be in use for less than five years, it equals the expected use time. The manufacturer sets the period so that it reflects how long the product is expected to be in use, taking into account reasonable user expectations, the nature and intended purpose of the product, and EU law that determines product lifetimes. The same paragraph says the support periods of third-party components that provide core functions may also be taken into account. In an embedded Linux device those components are the kernel and the distribution itself. The information used to set the period goes into the technical documentation. The Commission may also set minimum support periods for specific product categories by delegated act.

The second is the availability of updates. Under Article 13(9), each security update made available to users during the support period stays available after it has been issued for at least 10 years or for the rest of the support period, whichever is longer.

The third is the declaration. Under Article 13(19), the end date of the support period, with at least the month and the year, is clearly stated at the time of purchase. Where technically feasible, the product shows the user a notification when the support period has ended.

There is one more paragraph, about versions. Under Article 13(10), if substantially modified later versions of a software product have been placed on the market, the manufacturer may meet the obligation to remediate vulnerabilities for the latest version only. The condition is that users of earlier versions can move to the latest version free of charge and without additional cost to adjust their hardware or software environment. How this paragraph applies to the image of an embedded device is a legal question. What it says on the engineering side is clear: a new major version that runs on the old hardware can be a legitimate alternative to patching the old one.

The Regulation applies from 11 December 2027 (Article 71). Products placed on the market before that date are outside these obligations unless they are substantially modified afterwards (Article 69(2)); the reporting obligation applies to them as well. We covered the full set of obligations and the reporting deadlines in our main CRA article. This article is not legal advice.

How long is a Yocto LTS?

Four years. The Yocto Project's release process document gives the rule in one sentence: "A new LTS release is made every two years and is supported for four years." Stable releases that are not LTS are supported for seven months, according to the same document.

Release Released Status (19 November 2026) End of support
Kirkstone 4.0 Spring 2022 EOL Ended in spring 2026
Scarthgap 5.0 April 2024 LTS April 2028
Wrynose 6.0 Spring 2026 LTS April 2030
Blacksail 6.1 Autumn 2026 Stable release April 2027
Garburn 6.2 In development Not released yet Not published

Release months differ by one month between sources: the releases page and the wiki say April 2026 for Wrynose, the manual text says May 2026. On the end dates all three sources agree.

The LTS after Wrynose has not been named and its schedule has not been published. The project wiki only says that future LTS releases are planned for four years as well. If the two-year rule holds, the next LTS comes out in spring 2028 and ends in April 2032, and the one after that comes out in spring 2030 and ends in April 2034. These dates are derived from the rule as it stands today; the project has not published such a schedule.

The rule has a side effect. Because LTS releases last four years and come out every two, the month one LTS ends is the month the LTS two steps later is only just released. Kirkstone and Wrynose showed this: one ended in spring 2026, the other was released in spring 2026. A team that plans to skip an LTS has an overlap window of zero.

How long is a kernel LTS?

Shorter than Yocto's. The kernel.org releases page says that "Each new longterm kernel usually starts with only a 2-year projected EOL", which can be extended if there is enough interest from the industry.

Series Released Projected end
6.18 30 November 2025 December 2028
6.12 17 November 2024 December 2028
6.6 29 October 2023 December 2027
6.1 11 December 2022 December 2027
5.15 31 October 2021 December 2026
5.10 13 December 2020 December 2026

The table is from kernel.org's "Longterm release kernels" list; the table on the page is dated 25 February 2026. On 19 November 2026 the kernel.org front page showed 7.3.5 as the latest stable kernel and 6.18.64 as the latest longterm release.

Two matches stand out. Kirkstone shipped with kernel 5.15; the projected end of that series is December 2026. The Scarthgap release notes say "The default kernel is the current LTS (6.6)"; the projected end of 6.6 is December 2027, the month the CRA starts to apply in full. The Scarthgap branch runs until April 2028, while the kernel.org projection for its default kernel series ends four months earlier.

Two caveats apply. Projected end dates can be extended; the table shows today's projection. And in most products the kernel is not linux-yocto but the silicon vendor's own branch. That is usually the case for products based on Texas Instruments, NXP i.MX and NVIDIA Jetson. Which upstream series that branch is based on, and until when the vendor updates it, is a separate date you have to ask for.

There is a longer option. The Civil Infrastructure Platform (CIP) project provides, in the words of its own page, "Super-Long-Term Stable (SLTS)" kernels with a maintenance period of ten years. We did not verify for this article which series are covered or when they end.

What does the math say for a product placed on the market on 11 December 2027?

No published release covers the five years. The assumptions are these: the product is placed on the market on the day the Regulation starts to apply, 11 December 2027; the support period is the minimum, five years; it ends on 11 December 2032. Yocto and kernel.org give a month for the end, not a day; we took the last day of the month. If you take the first day, the covered times get about one month shorter.

Basis Upstream end Covered after placing on the market Left uncovered
Yocto Scarthgap 5.0 April 2028 about 4.5 months about 4 years 7.5 months
Yocto Wrynose 6.0 April 2030 about 2 years 4.5 months about 2 years 7.5 months
2028 LTS (derived from the plan) April 2032 about 4 years 4.5 months about 7.5 months
2030 LTS (derived from the plan) April 2034 all of it none
Kernel 6.6 December 2027 ends in the same month about 5 years
Kernel 6.12 and 6.18 December 2028 about 1 year about 4 years

The third and fourth rows rest on the assumption that the rule "an LTS every two years, supported for four" continues as it is today; the project has not published these dates. Even under that assumption the 2028 LTS falls about seven and a half months short of December 2032.

Three things follow from the table. A product that ships with Scarthgap in December 2027 loses the branch it is built on before the first five months of its support period are over. A product that ships with Wrynose reaches the same point before half of the period has passed. And a product that wants to stay under upstream support for all five years makes, on today's plan, at least one major release change while its devices are in the field, and at least two if it starts from Scarthgap.

That is the minimum. If the product is expected to be in use for ten years, the period Article 13(8) asks for does not stop at five, and the right-hand column grows.

What goes into an LTS branch, and what does not?

Only fixes. The release process document sums up the policy for stable branches as "bug fixes and security fixes only". Accepted are security and CVE fixes, bug fixes, and version updates that follow an upstream stable series aligned with the original release. Not accepted are general version upgrades, new features, and changes that break the ABI or API.

This has two practical consequences. Staying on an LTS branch means living with the same major versions for four years: the same kernel series, the same C library, the same OpenSSL series. If the upstream of a component drops that series, fixes have to be backported. Second, this policy applies to the branches the Yocto Project maintains. Whether the other layers you add to the product (the vendor's BSP layer, community layers, your own layer) follow the same period and the same policy has to be checked separately.

What happens after an LTS ends is documented too. The life cycle on the project wiki is "Initial Release -> LTS -> Community -> EOL". A branch stays in community support only if there is a volunteer maintainer; in that state there are no point releases and no release artifacts. When no maintainer is left, the branch becomes EOL. The wiki describes EOL as a state with some community support on mailing lists but no commits in the repositories, and notes that OS vendors offer support for some EOL releases.

How do you close the gap?

There are four ways. Most products use two of them together.

A planned migration to the next LTS. During its support period the product moves to a new Yocto LTS: new kernel, new toolchain, new userspace. The contract that is visible from outside (partition layout, format of the update package, interfaces the application expects) is frozen; the inside changes. The price of this route is the migration itself: every layer has to be adapted to the new release and the product has to be verified again. We listed what breaks between Kirkstone and Scarthgap, item by item, in our migration article.

Extended maintenance of the old branch. After the LTS ends, someone else keeps the branch going: a commercial OS vendor or a volunteer community maintainer. The Yocto wiki mentions both possibilities. This route postpones the migration, it does not remove it; the day the contract or the volunteer ends, the same question comes back.

A longer basis for the kernel. Since the kernel project started to assign its own CVE numbers, the number of kernel CVEs has grown fast, and the kernel's schedule is shorter than the distribution's. CIP's SLTS kernels or the silicon vendor's long-term branch can narrow this gap. The question to ask is the same in both cases: are my series and my SoC covered, and until what date?

Your own backporting. After the upstream branch ends, you carry the fixes yourself. This is always technically possible and gets more expensive every year: for each CVE you have to assess whether you are affected, adapt the patch to the old series and test it, and the further the branch drifts, the less cleanly patches apply. Knowing which component is affected by which vulnerability takes an SBOM and CVE tracking; we covered that in our SBOM article.

Declaring a support period shorter than five years does not count as a route. Article 13(8) allows it only if the expected use time of the product really is shorter, and the reasoning sits in the technical documentation. For an industrial device that runs in the field for years, that is hard to argue.

How does the migration reach a device in the field?

Over the update path that ships with the product; there is no other way. An LTS migration is the largest update a device will ever receive: kernel, root file system and often the bootloader change in the same package. That update has to be signed, has to leave the device bootable if it is interrupted halfway, and has to be able to return to the old system if the new one does not run properly. An update scheme that overwrites a single copy cannot carry a change of this size safely. We described where A/B layouts and rollback break in our article on OTA failure modes.

The design rule that follows is this: the path that will carry the migration is inside the device years before the migration, from the first shipment. The partition layout chosen on day one, the bootloader's slot selection logic and the signature verification chain set the limits of the change five years later. Are the partitions large enough for the new root file system, can the bootloader be updated in the field, can the signing key be replaced? These questions are answered before December 2027.

Article 13(9) adds one more detail. If each published security update has to stay available for at least 10 years, the update server, the package archive and the signing keys are planned to outlive the sales life of the product. This work is part of secure boot and OTA design.

What do you decide today for December 2027?

The decision to make today is a schedule: which LTS you ship on and when you move to the one after it. The starting point depends on where you are now:

Where you are Known dates First decision
Product is on Kirkstone Kirkstone EOL; December 2026 for kernel 5.15 The migration cannot wait; set the target LTS and the date
Product is on Scarthgap Scarthgap April 2028; December 2027 for kernel 6.6 Either ship on Wrynose or plan the first field migration before launch
New design Wrynose April 2030 Start on Wrynose; write the move to the next LTS into the roadmap

Whichever row you are in, the same four things have to be written down: the month and year of the end of support that will be stated at the time of purchase; from which LTS to which, and in which quarter, you move before that date; who the kernel fixes come from; and the present limits of the update path that will carry the migration to the field. If these four are not written down, there is no plan behind the declared support period.

Where it goes wrong

  1. Treating the end of the LTS as the end of product support. The distribution's schedule does not set your obligation; the obligation starts when the product is placed on the market and lasts at least five years.
  2. Looking only at the Yocto schedule. The kernel series and the vendor's BSP branch have their own dates, and they are often earlier. The four-month difference between Scarthgap and 6.6 is an example.
  3. Treating a projected date as fixed. kernel.org dates can be extended. Building the plan on an extension moves the risk that it does not happen into the product.
  4. Planning to skip an LTS. When you move two LTS releases ahead, the new one is only just released the month the old branch ends; there is no overlap and no time left for testing.
  5. Thinking about the migration without the update path. A device in the field can receive the new release only through its own update scheme. With a single-copy scheme or one without rollback, a major release change turns into a site visit.
  6. Forgetting that updates stay available for ten years. Switching off the server when the support period ends conflicts with Article 13(9); the key and archive plan is made at the start.

What this article cannot tell you

There is not a single measurement of ours in this article. All dates come from public schedules and were read on 19 November 2026. Schedules change: the kernel.org table is dated 25 February 2026, and projected end dates can be extended.

We read the articles of the Regulation from a source that reproduces the Official Journal text, because EUR-Lex returned an empty response to automated access. The binding text is on EUR-Lex; check the article numbers there.

These are the things we do not know or did not verify:

  • The support period of your product. It depends on the expected use time and can be longer than five years. Whether the period runs separately for each unit, and how Article 13(10) applies to a device image, are legal questions.
  • The default kernel series of Wrynose. We did not verify it from the release notes, so it is not in the table.
  • The kernel series CIP covers and their end dates. We only read the project's ten-year maintenance target.
  • The schedules of silicon vendors' BSP branches. They differ by vendor and by product family.
  • The real dates of the 2028 and 2030 LTS releases. The rows in the table are derived from today's rule.
  • The duration and cost of a migration. They depend on the number of layers, the hardware and the test scope; we give no figures.

This is the layer we work in: Yocto LTS migrations and BSPs, secure boot, and OTA with rollback. We do not sell hardware; we provide software services. If you want to place your product's schedule into this table, that is what the architecture audit is for.

Frequently asked questions

How long is the support period under the CRA?

Under Article 13(8) of Regulation (EU) 2024/2847 the support period is at least five years. If the product is expected to be in use for less than five years, the period equals the expected use time. Five years is the floor; the manufacturer sets the period so that it reflects how long the product is expected to be in use, and states the end date with at least the month and the year at the time of purchase.

How long is a Yocto LTS supported?

Yocto Project LTS releases are supported for four years and come out every two years. Scarthgap 5.0 runs until April 2028 and Wrynose 6.0 until April 2030. Kirkstone 4.0 went out of support in spring 2026. Stable releases that are not LTS are supported for seven months.

Does Scarthgap cover the CRA's five-year support period?

Not on its own. The five years of a product placed on the market on 11 December 2027 end on 11 December 2032; upstream support for Scarthgap ends in April 2028, about four and a half months later. For the rest of the period you need a migration to the next LTS, extended maintenance, or your own backporting.

How long are Linux kernel LTS releases supported?

According to kernel.org, each new longterm kernel usually starts with a two-year projected end, which can be extended depending on industry interest. The table dated 25 February 2026 projects December 2027 for 6.6 and 6.1, and December 2028 for 6.12 and 6.18. The CIP project also provides SLTS kernels with a ten-year maintenance period.

Where do security fixes come from after a Yocto LTS ends?

Not from the Yocto Project. The branch moves to community support if there is a volunteer maintainer; otherwise it becomes EOL and receives no commits in the repositories. That leaves four routes for fixes: a migration to the next LTS, commercial or community extended maintenance, a longer basis for the kernel such as CIP, or backporting by your own team.

Can a support period shorter than five years be declared?

Only if the expected use time of the product really is shorter than five years. In that case Article 13(8) sets the period equal to the expected use time and requires the reasoning to be in the technical documentation. The fact that support for the Linux release you use ends early is not a reason by itself.

Sources

Accessed: 19 November 2026.