The EU Cyber Resilience Act (CRA, Regulation (EU) 2024/2847) is read with two dates. The reporting obligation started on 11 September 2026: once a manufacturer learns that a vulnerability in its product is being actively exploited, it has 24 hours to send an early warning. The rest of the regulation applies from 11 December 2027, and from that day a connected device placed on the EU market has to come with a support period of at least five years, a software bill of materials (SBOM) and a secure way to get updates onto units in the field. This article maps those obligations onto the layers of an embedded Linux device: the build system, the boot chain, the update path and the support calendar. This article is not legal advice.

In short

  • The CRA entered into force on 10 December 2024. Reporting (Article 14) applies from 11 September 2026 and the whole regulation from 11 December 2027. As of 19 November 2026 the Commission's pages show no postponement.
  • Reporting also covers in-scope products placed on the market before 11 December 2027 (Article 69(3)): an early warning within 24 hours, a notification within 72 hours, and a final report no later than 14 days after a fix is available.
  • The support period is at least five years (Article 13(8)). Each security update stays available for at least 10 years or for the rest of the support period, whichever is longer (Article 13(9)).
  • Drawing up an SBOM is mandatory (Annex I Part II(1)); handing it to users is not (Annex II point 9).
  • Most of this cannot be added in the last quarter before shipping. The choice of distribution, the partition layout and the boot keys are decisions made together with the board design.

What does the CRA regulate, and who does it bind?

The CRA is a market access regulation. It sets the cybersecurity conditions under which a product with digital elements, hardware or software, may be placed on the EU market, and it puts the obligation on the manufacturer. What counts is that the product is on the EU market; a device designed in Türkiye and sold into the EU is subject to the same conditions.

The obligations fall into two groups. The first is about the product itself (Annex I Part I): how it is configured when it ships, how it protects its integrity, whether its vulnerabilities can be fixed by an update. The second is about the manufacturer's process (Annex I Part II): documenting components and vulnerabilities, releasing fixes without delay, distributing updates securely. Two more obligations sit on top: a declared support period (Article 13) and incident reporting (Article 14).

On an embedded Linux device, all four of these land in the software architecture. The sections below first state what the regulation says, with article numbers, and then show what that corresponds to on the device and in the build system.

Which date starts what?

There are four dates, and two of them have already passed.

Date What happens Basis
10 December 2024 The regulation entered into force Commission summary
11 June 2026 Chapter IV (notification of conformity assessment bodies) started to apply Article 71
11 September 2026 The reporting obligation (Article 14) started Article 71
11 December 2027 The whole regulation applies Article 71

On 19 November 2026, the day this article was written, the European Commission's CRA summary and reporting pages carry no announcement of a postponement or change to the 11 December 2027 date. Plans should be made against that date.

Reporting already applies: who reports what, and within how many hours?

The manufacturer notifies every actively exploited vulnerability in its product, and every severe incident affecting the security of the product, to the CSIRT designated as coordinator and to ENISA at the same time, through the single reporting platform (Article 14). According to the Commission's reporting page, the platform has been operational since 11 September 2026.

Step Actively exploited vulnerability Severe incident
Early warning Within 24 hours of becoming aware Within 24 hours of becoming aware
Notification Within 72 hours Within 72 hours
Final report No later than 14 days after a corrective or mitigating measure is available Within one month after the notification was submitted

Three details change the plan:

  • Old products are in scope too. Under Article 69(3), reporting applies to all in-scope products placed on the market before 11 December 2027. The clock also runs for the device you shipped last year.
  • Users are informed as well. Article 14(8) requires that affected users are told about the vulnerability or incident and about the measures they can take.
  • Small companies get a narrow exception. Under Article 64(10), micro and small enterprises are not fined for missing the 24-hour early warning deadline. The obligation itself remains.

The clock starts when the manufacturer becomes aware. The early warning also states in which Member States the product has been made available; the 72-hour notification asks for the nature of the vulnerability, the measures taken, and the measures users can take. On a weekend night these questions can only be answered if three things already exist: a record of which software version runs on which device, the component list for that version, and an on-call arrangement that says who files the notification. The deadline for the final report counts from the day the fix is available, so the speed of the pipeline that builds a fix and gets it to the field matters directly here.

What happens to products placed on the market before 11 December 2027?

Apart from reporting, the obligations do not apply to old products automatically. Under Article 69(2), a product placed on the market before 11 December 2027 becomes subject to the regulation's requirements only if it undergoes a "substantial modification" after that date.

Article 3(30) defines a substantial modification as a change to the product after it has been placed on the market which affects its compliance with the essential cybersecurity requirements in Annex I Part I, or which changes the intended purpose for which the product was assessed. For a long-lived product family this definition turns into a practical question: does a major software release in 2028 pull hardware sold in 2026 into scope? The answer depends on what the change is, and it is assessed product by product. The safe way to stay clear is to plan product lines that will still be alive after 2027 as if they were new products now.

The support period: what does "at least five years" commit you to?

The support period is at least five years; if the product is expected to be in use for less than five years, the support period equals that expected use time (Article 13(8)). When setting the period the manufacturer takes into account reasonable user expectations, the nature of the product and its intended purpose, and puts the information it relied on into the technical documentation.

Two more paragraphs of the same article touch the architecture:

  • Article 13(9): each security update released during the support period stays available after release for at least 10 years or for the rest of the support period, whichever is longer. The update server and the package archive have to outlive the product.
  • Article 13(19): the end date of the support period, at least the month and the year, is clearly stated at the time of purchase. Where technically feasible, the product shows the user a notification when the period has ended.

On embedded Linux, five years collides with the calendar of the distribution right away. According to the Yocto Project's own release page, Scarthgap 5.0 LTS is supported until April 2028 and Wrynose 6.0 LTS until April 2030. A product placed on the market on 11 December 2027 completes its five years in December 2032; no Yocto LTS released so far reaches that date. The full calculation and the ways to close the gap are in a separate article: CRA's five-year support period vs Yocto and kernel LTS. For a BSP still on Kirkstone, the first step is the migration to Scarthgap.

What is required of the device itself?

Annex I Part I lists the properties of the product. Four points shape the architecture of an embedded device most:

  • (2)(a) No known exploitable vulnerabilities at release. Before a release, the components have to be scanned against known vulnerabilities and each finding assessed. That cannot be done without a component list.
  • (2)(b) Secure by default configuration. Unless manufacturer and business user agree otherwise, the product ships with a secure default configuration and can be reset to its original state.
  • (2)(c) Fixable by updates. Vulnerabilities must be addressable through security updates. Where applicable, updates install automatically, this setting is enabled by default, and the user gets a clear and easy opt-out.
  • (2)(f) Integrity. Stored and transmitted data, commands, programs and configuration are protected against modification not authorised by the user, and corruption is reported.

The regulation names no technology in these points. A/B partitioning, signed images and verified boot do not appear in the text; they are the common engineering ways of meeting the requirement.

What is required of the manufacturer's process?

Annex I Part II describes vulnerability handling in eight points. The ones that reach furthest into the product architecture:

  • (1) Components and vulnerabilities in the product are documented. As part of this, a software bill of materials is drawn up in a commonly used, machine-readable format, covering at the very least the top-level dependencies of the product.
  • (2) Vulnerabilities are remediated without delay. Where technically feasible, security updates are provided separately from functionality updates.
  • (4) Once a security update is available, information about the fixed vulnerabilities is shared.
  • (5) A coordinated vulnerability disclosure policy is put in place and enforced.
  • (7) Mechanisms are provided to distribute updates securely.
  • (8) Security updates are disseminated without delay and, unless manufacturer and business user agree otherwise, free of charge.

One point about the SBOM is often mixed up. Drawing it up is mandatory; publishing it is not. Annex II point 9 only says that if the manufacturer decides to make the SBOM available to the user, it states where it can be accessed. How Yocto produces this list, and where it falls short, is covered in SBOM from Yocto for the Cyber Resilience Act.

The "provided separately" condition in point (2) affects release strategy. If a security fix only arrives inside a large release full of new features, the customer has to accept behaviour changes to get the fix. Separating a maintenance branch from the feature branch therefore stops being a matter of process taste.

Which engineering layer does each obligation land on?

The first two columns of the table below come from the regulation; the third is our engineering reading. The third column is not the only way to meet the requirement. It is the most common one on embedded Linux.

Obligation Basis Counterpart on the device and in the build system Details
Document components and vulnerabilities, SBOM Annex I Part II(1) SBOM generated automatically in every build, mapping of components to CVEs SBOM from Yocto
No known exploitable vulnerabilities at release Annex I Part I(2)(a) CVE scan before release and an assessment record for each finding Same article
At least five years of support Article 13(8) LTS calendar of distribution and kernel, at least one planned migration Support period and LTS
Remediate vulnerabilities, distribute updates securely Annex I Part II(2), (7), (8) Signed update bundle, A/B partition layout, rollback, health confirmation OTA failure modes
Fixable by updates, automatic updates Annex I Part I(2)(c) Update client on the device, automatic mode on by default, option to postpone Secure boot and OTA
Protection of integrity Annex I Part I(2)(f) Verified boot chain, signed kernel and root file system Secure boot and OTA
Secure by default configuration Annex I Part I(2)(b) Debug interfaces closed in the production image, no shared default password, no unneeded services, factory reset Yocto and BSP
24-hour and 72-hour reporting Article 14 Device and version inventory, on-call arrangement, pipeline that carries the fix to the field This article
Updates stay available for 10 years Article 13(9) Release archive, long-lived download infrastructure, reproducible build This article
State the end of support at the point of sale Article 13(19) Date on the label or in the interface, notification on the device when the period ends Support period and LTS

What the table shows is this: half of the rows depend, directly or indirectly, on a single subsystem, the update path. Fixing a vulnerability, getting the fix out without delay, being able to file the final report within 14 days, and carrying at least one distribution migration to the field within five years all go through the same mechanism. Our 60-second film Power Cut at 63% shows how that mechanism behaves at its worst moment.

Does your product fall into the "important product" classes?

The regulation treats some product categories as "important products" and splits them into two classes (Annex III). The entries relevant to the embedded world:

Class Categories listed in Annex III (selection)
Class I Boot managers; operating systems; physical and virtual network interfaces; routers, modems intended for the connection to the internet, and switches; microprocessors, microcontrollers, ASICs and FPGAs with security-related functionalities
Class II Hypervisors and container runtime systems; firewalls, intrusion detection and prevention systems; tamper-resistant microprocessors and microcontrollers

The criterion is the core functionality of the product. The Commission published the technical descriptions of the categories in Implementing Regulation (EU) 2025/2392 of 28 November 2025. Whether a sensor gateway, an operator panel or a camera unit falls on one side or the other is decided by looking at what the product is actually for, read together with those descriptions. We do not classify products in this article, and we do not cover how the class affects the conformity assessment route. The one thing we can say is that this question needs to be asked early.

How large are the fines, and where do the standards stand?

Under Article 64(2), non-compliance with the essential requirements in Annex I and with the obligations in Articles 13 and 14 is subject to administrative fines of up to EUR 15 million or, if the offender is an undertaking, up to 2.5 % of its total worldwide annual turnover for the preceding financial year, whichever is higher.

The Commission's pages refer to harmonised European standards that will make the requirements concrete, but they give no numbers or dates, and we have not checked them either. Until those arrive, one of the most concrete technical guides available is TR-03183 from the German Federal Office for Information Security (BSI). The BSI is explicit about the status of the document: it is a guide, it is not binding, it gives no presumption of conformity, and it will be replaced by harmonised standards as they become available. Its second part (version 2.1.0, 20 August 2025) describes the format and the required fields of an SBOM.

Why can these decisions not be left to the last quarter?

Because many of the properties the regulation asks for cannot be added later by a software update; they depend on the board design and on the production line.

  • Partition layout. An update that can roll back needs room for a second copy next to the running system. Storage size is chosen in the board design. Changing the partition table of a device in the field is exactly the risk you are trying to avoid.
  • Boot keys. Verified boot relies on a key hash written into the chip's one-time programmable fuses. That step happens on the production line and cannot be undone. Where the keys are kept, and how a key is revoked, has to be decided before it.
  • Distribution and kernel version. The support period starts counting at shipment; the LTS you picked started counting years earlier. Which release you ship on and when you move to the next one is part of the roadmap.
  • Reproducible build. To make a one-line security fix to a release shipped three years ago, you have to be able to rebuild that release today: source mirrors, pinned layer revisions, a preserved build environment.
  • Device identity and inventory. To answer "which devices are affected" within 24 hours, the identity of every unit and the version it runs has to be on record from shipment onwards.

Of these five decisions, only the last can be partly made up for after shipment. The others freeze with the product.

Where it goes wrong

  1. Saying "we have until December 2027". Reporting has applied since 11 September 2026 and also covers products sold earlier. For a manufacturer with devices in the field today, the obligation has started.
  2. Treating the SBOM as a document written once. A hand-maintained spreadsheet is out of date after the first update. The list has to come out of the build system again for every software version; otherwise it shows what was once planned, and what runs on the device stays unknown.
  3. Leaving the update path until after the first release. A device that ships with a single-copy layout cannot recover on its own from an interrupted update. Moving to an A/B layout later usually means a site visit.
  4. Declaring a support period without a calendar. Printing five years on the label is easy. The real work is writing down which LTS ends in which month of those five years, and when the migration happens.
  5. Meeting the 24 hours without a process. If vulnerability reports land in a mailbox nobody reads at the weekend, the deadline passes unread. You need a channel that defines and records the moment of becoming aware.
  6. Guessing the class. Whether having an operating system and a bootloader inside pulls a device into those categories is not a question to answer by guessing. The criterion is core functionality, and it calls for a written assessment.

What this article cannot tell you

This article covers the side of the regulation that faces an embedded Linux device. It does not cover the following.

  • The status of your product. We cannot tell you whether your product is in scope, which class it falls into, or which conformity assessment route applies. We also did not cover the product groups the regulation leaves out, or how it relates to sector-specific rules.
  • The reading of "substantial modification". Whether a particular software update counts as a substantial modification depends on applying the definition to the concrete case. We did not read the Commission's guidance documents for this article.
  • Standards. We have not checked the numbers, scope or publication schedule of the harmonised standards.
  • The source of the text. EUR-Lex returned empty responses to automated access, so we read the articles from a mirror that reproduces the Official Journal text, and checked dates and deadlines against the Commission's own pages. The binding text is the one on EUR-Lex; read the articles there before you decide anything.
  • Measurements. There is not a single measurement of ours in this article. We offer no data on how the 24-hour deadline plays out in a real incident, or on how long it takes to get a fix to a fleet.

The third column of the table is where we work. We provide software services and do not sell hardware: Yocto LTS migrations, BSPs for TI, NXP and NVIDIA platforms, secure boot, and OTA with rollback. If you want a second pair of eyes on your update path and boot chain before 2027, that is what the architecture audit is for.

Frequently asked questions

When does the CRA fully apply?

The Cyber Resilience Act (Regulation (EU) 2024/2847) entered into force on 10 December 2024 and applies in full from 11 December 2027. The reporting obligation (Article 14) started earlier, on 11 September 2026. As of 19 November 2026 the Commission's pages carry no announcement that changes these dates.

Does CRA reporting cover products sold before 2027?

Yes. Under Article 69(3), reporting applies to all in-scope products placed on the market before 11 December 2027. After learning of an actively exploited vulnerability, the manufacturer sends an early warning within 24 hours, a notification within 72 hours, and a final report no later than 14 days after a fix is available.

How long is the support period under the CRA?

At least five years. If the product is expected to be in use for less than five years, the support period equals that expected use time (Article 13(8)). The end date, at least month and year, is stated at the time of purchase (Article 13(19)), and each security update stays available for at least 10 years or for the rest of the support period (Article 13(9)).

Does the CRA require an SBOM, and do you have to give it to customers?

Drawing it up is mandatory. Annex I Part II(1) asks for a software bill of materials in a commonly used, machine-readable format, covering at the very least the top-level dependencies. Giving it to users is not mandatory: Annex II point 9 only requires that, if the manufacturer decides to make it available, it states where it can be accessed.

How large are the fines for not meeting the CRA?

Under Article 64(2), non-compliance with the essential requirements in Annex I and with the obligations in Articles 13 and 14 is subject to administrative fines of up to EUR 15 million or up to 2.5 % of the undertaking's worldwide annual turnover, whichever is higher.

Where do you start CRA preparation for an embedded Linux device?

Our suggestion is to start with four questions. Which software version runs on which device? Does the component list for that version come out of the build system? Does an interrupted update leave the device in a working state? In which month does support end for the distribution and the kernel you use? The first question without an answer is the first work item.

Sources

Accessed: 19 November 2026.